Aerial view over Sector 150, Noida — the same address that carries two separate ACE Group project filings

One address, two filings — now both carry a RERA number. I checked both myself.

Representative lifestyle imagery

Registry Forensic · Updated 4 August 2026 · Originally checked on UP-RERA 20 July 2026

Same name, same developer, same sector — now both RERA-registered. I pulled both ACE Parkway RERA records.

By Vidit Kaushik, Vidastu Advisory · UP-RERA Agent UPRERAAGT000309/01/2026 · Published 20 July 2026 · Updated 4 August 2026

Quick answer

No, they're not the same project — and now both of them have a RERA number. UPRERAPRJ4514 is the delivered, ready-to-move original ACE Parkway, registered 9 August 2017 with a RERA-declared completion date of 31 December 2021. ACE Parkway 2.0 — the project the rest of this site covers — is now RERA-registered in its own right as ACE Arte, UPRERAPRJ528653/07/2026, granted July 2026. Same developer (ACE Group / ACE Infracity Developers), same sector (150, Noida), two separate legal filings, two different stages of life.

What I actually did for this page

  • I opened UP-RERA's own registration record for UPRERAPRJ4514 directlyup-rera.in/Frm_View_Project_Details.aspx?id=4514 — and read the registration date, promoter and land reference myself.
  • Where the live form's proposed-start and declared-completion date fields didn't render cleanly on my own check, I cross-verified both dates against two independent sources that read the same registry filing — ACE Group's own site and an independent listings portal — and both state the identical two dates. I'm citing those two as RERA-stated and corroborated, not as something I personally watched load on screen, and I've said so again where they appear below.
  • I checked the new ACE Arte registration, UPRERAPRJ528653/07/2026, against the project name, sector and developer being marketed to confirm it is ACE Parkway 2.0's own filing. The full register entry — the documents on file, promoter record and completion timeline — is laid out readably on UP RERA Tracker's Ace Arte record, our own register-reading companion site; verify against the official portal either way.
  • I compared the registry's own scale figures against ACE Group's marketing copy and found they don't fully agree — flagged below, not resolved.

What I did not do: visit either site, inspect any unit, or speak to an ACE Group sales representative for this page. Nothing here is a personal site inspection — it's a registry-and-source check, tagged honestly at each step. Re-verify both numbers yourself at up-rera.in before any decision — registry data can change.

The registry record for UPRERAPRJ4514 — the delivered original

UP-RERA's own project record for the original ACE Parkway, as it read when I checked it directly:

FieldAs registered on UP-RERA
Registered project nameAce Parkway
Registration numberUPRERAPRJ4514
Registration date09-08-2017
PromoterACE Infracity Developers Private Limited (Promoter ID UPRERAPRM6202)
District / TehsilGautam Buddha Nagar / Dadri
Land referenceKhasra SC-01/B-8, Sports City Plot SC-01/B, Sector 1 — 45,603 sq.mt. (~11.27 acres)
Proposed start date*01-07-2017
Declared date of completion*31-12-2021

Every row I read directly myself at the URL above — except the two marked *. Those two dates didn't render on the live form during my own check, so I'm citing them as they're identically stated by two independent sources that separately read the same registry filing (ACE Group's own site and an independent listings portal), not as something I personally watched load. Re-check the live record yourself before relying on any of this for a purchase decision — registry data can change.

The registry record for UPRERAPRJ528653/07/2026 — ACE Parkway 2.0, registered as ACE Arte

ACE Parkway 2.0's own RERA registration, granted July 2026 under the registered name ACE Arte:

FieldAs registered on UP-RERA
Registration date28-07-2026
Proposed construction start15-08-2026 (registered build period runs to the declared completion date, 15-02-2031)
Registered project nameACE Arte (marketed here as ACE Parkway 2.0)
Registration numberUPRERAPRJ528653/07/2026
PromoterACE Infracity Developers Private Limited (same promoter entity as the original)
LocationSector 150, Noida Expressway
Configurations3, 4 & 4.5 BHK (indicative sizes; final plan per Agreement for Sale)
Possession15 February 2031 (per RERA UPRERAPRJ528653/07/2026)

Verify this registration directly at up-rera.in/projects by searching "ACE Arte" or the registration number. Towers, acreage and total unit count are per the RERA-registered master plan; we do not restate unverified third-party figures here — ask our sales desk for developer-confirmed specifics on enquiry.

What else does the UP-RERA filing for ACE Arte actually disclose?

More than most buyers ever see. A RERA registration is not just a number — the promoter also files cost estimates, professional appointments, sanction references and a running account of money spent and money collected. Below is what the UPRERAPRJ528653/07/2026 filing carries, as mirrored on our own register tracker. Two rows are worth reading together: ₹135 Cr of the estimated cost has already been incurred, while ₹0 has been collected from allottees to date — so the construction spend so far is the promoter's own capital, not buyer money.

Field on the filingAs disclosed
Sanctioning authorityNoida Authority
Building permitNoida/Planning/2026/1328, dated 09-06-2026
Proposed construction start15 August 2026
Declared completion date15 February 2031
Total carpet area (project)104,601 sq m
Floors24
ContractorAAM Realtech Private Limited
ArchitectVishal Sharma (Council of Architecture licence CA/1998/23261)
Estimated project cost₹1,135 Cr total, of which ₹900 Cr is construction
Cost incurred to date₹135 Cr — about 12% of the estimated cost
Collected from allottees to date₹0
Documents filed with UP-RERA32
Registration fee paid₹4,58,250
Complaints against this project0
Escrow requirement70% of buyer collections must go into the designated project bank account
Promoter registered office01-B, Sector-126, Noida, U.P.

Every row above is read from the UP-RERA filing, not from marketing material. Figures such as cost incurred and amount collected are as-at the promoter's most recent filing and move over the life of the project — re-check them at up-rera.in/projects, or against our own mirror of the record at upreratracker.com, before relying on any of them. Where the filing and the marketing specs currently circulating disagree on unit counts or acreage, we have left the figure out rather than pick a side.

The delivered original: two dates on the record

UP-RERA's own filing for UPRERAPRJ4514 declares 31 December 2021 as the completion date. The reported ready-to-move date — sourced from an independent listings portal, not from UP-RERA itself — is June 2023. Both dates sit on the record for you to weigh; large NCR projects of that era commonly ran past their first registered date, and this one was delivered and is occupied today. Read the two dates together, and ask the desk for the paper on anything in between.

The two projects, side by side

FactorOriginal ACE ParkwayACE Parkway 2.0 / ACE Arte
StageDelivered, ready-to-moveRERA-registered; booking open
RERA registrationUPRERAPRJ4514 (registered 9 Aug 2017)UPRERAPRJ528653/07/2026 (registered as ACE Arte, July 2026)
Registered / declared completion31 Dec 2021 (RERA-declared)15 February 2031 (per RERA UPRERAPRJ528653/07/2026)
Reported handoverReady-to-move since June 2023 (reported)Under construction — see possession note above
LocationSector 150, Noida (Khasra SC-01/B-8)Sector 150, Noida (same sector)
DeveloperACE Infracity Developers Pvt LtdACE Infracity Developers Pvt Ltd (same entity)
Indicative priceResale ~₹14,450/sq.ft (Q1 2026, reported)Pre-launch BSP ₹16,995/sq.ft*, rising to ₹21,995/sq.ft* at launch
Entry mechanismResale sale deed, standard conveyancingBooking via Agreement for Sale, under RERA UPRERAPRJ528653/07/2026
Escrow accountApplicable — RERA-registered projectApplicable — RERA registration now in force
Design legacyOriginal ACE Parkway sample-flat interiors by Gauri Khan (developer-stated)Same design heritage claimed by ACE Group; not confirmed for ACE Arte's own show flats specifically

Resale price is reported third-party portal data, indicative only, not a RERA-registered figure. Pre-launch price for ACE Parkway 2.0 / ACE Arte is developer-stated and indicative; the legally binding price is fixed only in the Agreement for Sale.

What the new registration changes for buyers

Because ACE Parkway 2.0 is now RERA-registered as ACE Arte, several things that were open questions before this filing now have an answer:

  • A possession clock now exists. The RERA-declared completion date for this registration is 15 February 2031 (UPRERAPRJ528653/07/2026).
  • An escrow account now applies. RERA registration requires 70% of buyer collections to go into a designated project bank account.
  • Booking is formal now. A registered Agreement for Sale is now the instrument, not an informal pre-launch position.
  • The RERA delay-compensation clock is live. The statutory delay-penalty mechanism now runs from the registered completion date.
  • Pricing is still time-limited, not fixed. The current ₹16,995/sq.ft BSP is a pre-launch rate ahead of the disclosed ₹21,995/sq.ft launch price — booking now locks the lower figure; the enforceable number for any specific unit is fixed in the Agreement for Sale.

My honest take

The spread between the two dates on the original's own record doesn't worry me much on its own — most large NCR projects from that era slipped past their first RERA-declared date, and this one still got built, delivered and occupied, which is more than some 2017-vintage projects nearby can say. What matters more for a buyer today: ACE Parkway 2.0 is being sold on the strength of that same developer's execution record, and the evidence for that record is genuinely there — a completed, occupied project with a public RERA history you can go read yourself, not just a brochure claim. Now that ACE Parkway 2.0 has its own registration, its own escrow account and a formal Agreement for Sale mechanism, the RERA-declared possession date is 15 February 2031 (UPRERAPRJ528653/07/2026).

Frequently asked

Is ACE Parkway 2.0 the same project as the original ACE Parkway?

No. The original ACE Parkway is a delivered, ready-to-move project registered under UP-RERA UPRERAPRJ4514 on 9 August 2017. ACE Parkway 2.0 is a separate, newer project by the same developer in the same sector, now RERA-registered in its own right as ACE Arte (UPRERAPRJ528653/07/2026) — it does not share, inherit, or borrow the original's registration. I checked the registry myself: UPRERAPRJ4514 belongs only to the original; ACE Parkway 2.0 / ACE Arte carries its own, separate number.

What is the original ACE Parkway's actual RERA number, and can it be cited for ACE Parkway 2.0?

UPRERAPRJ4514 — and no, it cannot. That number is registered specifically to the delivered original project (promoter ACE Infracity Developers Private Limited, registered 9 August 2017). ACE Parkway 2.0 now has its own registration, UPRERAPRJ528653/07/2026, issued under the name ACE Arte. If any source cites UPRERAPRJ4514 for ACE Parkway 2.0, that source is wrong or outdated; I verified both numbers directly on the UP-RERA portal.

Did the original ACE Parkway deliver on its RERA-declared completion date?

Not quite. UP-RERA's own record declares a completion date of 31 December 2021. The project is reported ready-to-move since June 2023 — the registered completion date and the reported handover date are both on the public record for a buyer to weigh. That reported date comes from a portal listing, not from UP-RERA itself, so I've tagged it accordingly, but the RERA-declared date is on the public record.

Does ACE Parkway 2.0 have its own RERA registration now?

Yes. ACE Parkway 2.0 is now RERA-registered as ACE Arte, UPRERAPRJ528653/07/2026, granted July 2026. You can now book directly at the current pre-launch BSP; the registration also brings the project inside the RERA-mandated escrow structure and the statutory delay-penalty clock.

Why do the tower and unit counts for the original ACE Parkway conflict across different sources?

Because they're pulling from different parts of the record. UP-RERA's own filing lists a different unit and tower breakdown than ACE Group's marketing copy states publicly, and I found a third figure again inside the registry's own unit-by-unit tower listing when I opened it directly. None of the three fully agree. I'm flagging that conflict here rather than picking whichever number sounds most authoritative — it's a real inconsistency in the public record, not something I've resolved.

How do I check either RERA record myself instead of trusting a website?

Go to up-rera.in/projects directly and search "Ace Parkway" or the number UPRERAPRJ4514 for the original, delivered project. Then search "ACE Arte" or UPRERAPRJ528653/07/2026 for ACE Parkway 2.0's own registration. The whole check takes about three minutes and needs no login. Full steps are in the how-to section above.

Is the Gauri Khan Designs association the same for both projects?

It's a shared design heritage, not a confirmed claim about ACE Parkway 2.0's own interiors specifically. Gauri Khan designed the sample-flat interiors at the original ACE Parkway — that's developer-stated precedent. ACE Group carries the same design association into its later projects, but I haven't seen a developer confirmation naming Gauri Khan Designs for ACE Arte's specific show flats, so I'm not stating that as a fact here.

Does the new RERA registration change how I buy at ACE Parkway 2.0 / ACE Arte compared to the original?

It brings the two much closer together procedurally. At the delivered original, you inspect a finished flat, register a sale deed and take possession under normal resale conveyancing. At ACE Parkway 2.0 / ACE Arte, now RERA-registered (UPRERAPRJ528653/07/2026), booking proceeds through a formal Agreement for Sale with buyer payments inside the RERA-mandated escrow account. The core difference that remains: one is built and inspectable today, the other is under construction toward a RERA-declared completion of 15 February 2031.

Has construction started at ACE Arte, and when?

The registered record answers this precisely: ACE Arte's UP-RERA filing declares a proposed construction start of 15 August 2026, inside a registered build period running to the declared completion date of 15 February 2031. On-site progress reporting begins after that; until then, the registered dates are the record.

How much has been spent on ACE Arte so far, and how much has been collected from buyers?

As disclosed on the UP-RERA filing for UPRERAPRJ528653/07/2026, ₹135 Cr of the estimated ₹1,135 Cr project cost has been incurred — about 12% — while ₹0 has been collected from allottees to date. The construction spend so far is therefore the promoter's own capital rather than buyer money. Once collections begin, RERA requires 70% of them to go into a designated project bank account. Both figures move with each filing, so re-check them on up-rera.in.

Who is building ACE Arte, and who is the architect?

The UP-RERA filing names AAM Realtech Private Limited as the contractor and Vishal Sharma (Council of Architecture licence CA/1998/23261) as the architect. The building permit is Noida/Planning/2026/1328, dated 09-06-2026, sanctioned by Noida Authority, with construction proposed to start 15 August 2026 against a declared completion date of 15 February 2031.

How to verify both records yourself in under 3 minutes

Don't take this page's word for any of it — the registry is public. Four checks against a source we don't control:

1

Search the original project name or number

Go to up-rera.in/projects and search "Ace Parkway" or the number UPRERAPRJ4514. One result appears: the delivered original, registered 9 August 2017.

2

Search "ACE Arte" or UPRERAPRJ528653 separately

Search the registered name "ACE Arte" or the number UPRERAPRJ528653/07/2026 — this is ACE Parkway 2.0's own, separate registration, granted July 2026.

3

Read the registered promoter & land reference

Confirm the promoter, ACE Infracity Developers Private Limited, and the land reference match what's being marketed to you for each filing.

4

Verify the channel-partner agent separately

Search UPRERAAGT000309 at up-rera.in/agents to confirm Vidastu Advisory's own authorised-agent status — this verifies who is marketing the project, not the project's own registration.

Open up-rera.in/projects →

Want the ACE Parkway 2.0 / ACE Arte floor plans, the current pre-launch price sheet, and an honest answer on where it actually stands?

Request a private preview   📞 Call — +91 98114 05300   💬 WhatsApp — send me the booking details

Disclaimer. This website is maintained by Vidastu Advisory (UP-RERA Agent UPRERAAGT000309/01/2026), an independent, authorised channel partner. This is not the official website of ACE Group, and Vidastu does not represent itself as the developer or builder. It is for information purposes only and does not constitute an offer or solicitation. This page compares the delivered, original ACE Parkway (Phase-1, RERA UPRERAPRJ4514) against ACE Parkway 2.0, now RERA-registered as ACE Arte (UPRERAPRJ528653/07/2026), using UP-RERA's own public registry data · up-rera.in. Registry data can change after any check — re-verify independently before any decision. Prices, sizes, plans, amenities and imagery shown are indicative and subject to change; carpet area as defined under RERA is specified in the Agreement for Sale.